Metal buildings in Ohio.

Carports, garages, RV covers and barns for Ohio properties. Who issues permits depends on your county or city, and farm buildings have their own rules. Here’s what to check.

Instant answer. No sign-up.

Your Ohio questions, answered.

Do you deliver anywhere in Ohio?

Yes. Our coverage includes the whole state.

Do I need a permit?

Check two offices. Building permits for homes and their garages come from a certified county or city building department where one exists. Township or county zoning handles setbacks and size limits. Ask both before you prepare the site.

Ohio Board of Building Standards ↗

Is a farm building exempt?

Often, yes. Townships cannot require a zoning certificate for farm buildings, except on smaller lots in subdivisions. When the county or township zoning inspector issues a certificate saying a building will be used for agriculture, it is exempt from the state building code. A garage for the house is not a farm building. Ask your township or county how to get the agricultural certificate.

Ohio Revised Code 3781.061 ↗

What snow load should I plan for?

Ask your building department. The snowbelt east of Cleveland, along Lake Erie, gets far more lake-effect snow than central and southern Ohio. Tell us where snow drifts or slides off other roofs.

Can a truck reach my place in spring?

Usually, but check. Ohio counties can cut weight limits on county and local roads by up to half during spring thaw, and they post signs when they do. Tell us which road leads to your property, and ask the county engineer if you are unsure.

How do delivery and installation work?

We review your building, location and site details before confirming timing. You prepare a level site and arrange required local approvals. Steep drives in southeast Ohio’s hills, field lanes, gates and overhead wires can make delivery harder. A quote request does not reserve an installation date.

Do I need to call 811 before installation?

Yes. Contact OHIO811 at least two working days before work starts, not counting the day you call, and no more than 16 calendar days ahead. Tell them where the building will sit and that ground anchors will be installed.

Lines you own, such as power to a barn or a private gas line from a well, are not marked through 811.

OHIO811 ↗

How deep does the frost go?

Your building department sets the footing depth for frost. It matters if you pour a slab with footings or a foundation. Frozen ground can also delay anchor installation in winter.

Useful Ohio resources

Next: Learn about the buildings we sell

Serving all of Ohio

Ohio cities and regional towns

Map labels show regional reference points, not delivery hubs or travel-time boundaries.